SB 2

  • California Senate Bill
  • 2011-2012, 1st Special Session
  • Introduced in Senate Feb 01, 2011
  • Passed Senate Feb 24, 2011
  • Passed Assembly Mar 29, 2011
  • Signed by Governor Apr 12, 2011

Energy: renewable energy resources.

Abstract

(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to require the state's 3 largest electrical corporations, Pacific Gas and Electric Company, San Diego Gas and Electric, and Southern California Edison, to identify a separate electrical rate component to fund programs that enhance system reliability and provide in-state benefits. This rate component is a nonbypassable element of local distribution and collected on the basis of usage. Existing PUC resolutions refer to the nonbypassable rate component as a "public goods charge." The public goods charge moneys are collected to support cost-effective energy efficiency and conservation activities, public interest research and development not adequately provided by competitive and regulated markets, and renewable energy resources. The existing Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) . The act requires the commission to certify sufficient sites and related facilities that are required to provide a supply of electric power sufficient to accommodate projected demand for power statewide. The act requires the commission to transmit a copy of an application for certification of a site and related facility to, among other entities, each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General. This bill would require an applicant to inform the United States Department of Defense of a proposed project and that an application will be filed with the commission if the site and related facility specified in the application are proposed to be located within 1,000 feet of a military installation, or lie within special use airspace or beneath a low-level flight path, as defined. Existing law establishes the Renewable Resource Trust Fund as a fund that is continuously appropriated, with certain exceptions for administrative expenses, in the State Treasury, and requires that certain moneys collected to support renewable energy resources through the public goods charge are deposited into the fund and authorizes the Energy Commission to expend the moneys pursuant to the Renewable Energy Resources Program. The program states the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year so that amount equals at least 20% of total retail sales of electricity in California per year by December 31, 2010. This bill would revise the Renewable Energy Resources Program to state the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year, so that amount equals at least 33% of total retail sales of electricity in California per year by December 31, 2020. The bill would revise certain terms used in the program, and revise certain eligibility criteria for a renewable electrical generation facility, as defined, pursuant to the program. (2) Existing law expresses the intent of the Legislature, in establishing the California Renewables Portfolio Standard Program (RPS program) , to increase the amount of electricity generated per year from eligible renewable energy resources, as defined, to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2010. The RPS program requires that a retail seller of electricity, including electrical corporations, community choice aggregators, and electric service providers, purchase a specified minimum percentage of electricity generated by eligible renewable energy resources, as defined, in any given year as a specified percentage of total kilowatthours sold to retail end-use customers each calendar year. The RPS program requires the PUC to implement annual procurement targets for each retail seller to increase its total procurement of electricity generated by eligible renewable energy resources by at least an additional 1% of retail sales per year so that 20% of its retail sales of electricity are procured from eligible renewable energy resources no later than December 31, 2010. Existing law requires the PUC to make a determination of the existing market cost for electricity, which PUC decisions call the market price referent, and to limit an electrical corporation's obligation to procure electricity from eligible renewable energy resources, that exceeds the market price referent, by a specified amount. This bill would express the intent that the amount of electricity generated per year from eligible renewable energy resources be increased to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2013, and 33% by December 31, 2020. The bill would require the PUC, by January 1, 2012, to establish the quantity of electricity products from eligible renewable energy resources to be procured by each retail seller for specified compliance periods, sufficient to ensure that the procurement of electricity products from eligible renewable energy resources achieves 25% of retail sales by December 31, 2016, and 33% of retail sales by December 31, 2020, and that retail sellers procure not less than 33% of retail sales in all subsequent years. The bill, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, would require that all retail sellers procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified. The bill would require the PUC to waive enforcement of the renewables portfolio standard procurement requirement if the PUC finds that the retail seller has demonstrated certain conditions exist that are beyond the control of the retail seller and will prevent compliance, and has taken all reasonable actions under its control to achieve compliance. The bill would require the PUC to direct each electrical corporation to annually prepare a renewable energy procurement plan containing specified matters and require, to the extent feasible, that the plan be proposed, reviewed, and adopted by the PUC as part of, and pursuant to, a general procurement plan process. The bill would require the PUC to direct all retail sellers to prepare and submit an annual compliance report. The bill would delete the existing market price referent provisions, and instead require the PUC to establish a limitation for each electrical corporation on the procurement expenditures for all eligible renewable energy resources used to comply with the renewables portfolio standard. The bill would require that by January 1, 2016, the PUC report to the Legislature assessing whether each electrical corporation can achieve a 33% renewables portfolio standard by December 31, 2020, and maintain that level thereafter, within the cost limitations. The bill would provide that, if the cost limitation for an electrical corporation is insufficient to support the projected costs of meeting the renewables portfolio standard procurement requirements, the electrical corporation is authorized to refrain from entering into new contracts or constructing facilities beyond the quantity that can be procured within the limitation, unless eligible renewable energy resources can be procured without exceeding a de minimis increase in rates, consistent with the electrical corporation's general procurement plan. The bill would delete an existing requirement that the PUC adopt flexible rules for compliance for retail sellers. The bill would revise the definitions of certain terms for purposes of the RPS program, would recast certain provisions applicable only to an electrical corporation with 60,000 or fewer customer accounts in California that serves retail end-use customers outside of California, and would add provisions applicable to certain smaller electrical corporations. The bill would authorize an electrical corporation to apply to the PUC for approval to construct, own, and operate an eligible renewable energy resource, and would require the PUC to approve the application if certain conditions are met, until electrical corporation owned and operated resources provide 8.25% of the corporation's anticipated retail sales. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by expanding the definition of a crime. (3) Under existing law, the governing board of a local publicly owned electric utility is responsible for implementing and enforcing a renewables portfolio standard for the utility that recognizes the intent of the Legislature to encourage renewable resources, while taking into consideration the effect of the standard on rates, reliability, and financial resources and the goal of environmental improvement. This bill would repeal this provision, and instead generally make the requirements of the RPS program applicable to local publicly owned electric utilities, except that the utility's governing board would be responsible for implementation of those requirements, instead of the PUC, and certain enforcement authority with respect to local publicly owned electric utilities would be given to the Energy Commission and State Air Resources Board, instead of the PUC. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program. (4) Existing law requires the Energy Commission to certify eligible renewable energy resources, to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers, and to develop tracking, accounting, verification, and enforcement mechanisms for renewable energy credits, as defined. This bill would require the Energy Commission to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers and local publicly owned electric utilities. The bill would require the Energy Commission, among other things, to adopt regulations by July 1, 2011, specifying procedures for enforcement of the RPS requirements that include a public process under which the Energy Commission is authorized to issue a notice of violation and correction with respect to a local publicly owned electric utility and for referral to the State Air Resources Board for penalties imposed pursuant to the California Global Warming Solutions Act of 2006 or other laws if that act is suspended or repealed. This bill would revise the definition of renewable energy credit. The bill would require the Energy Commission, by June 30, 2011, to study and provide a report to the Legislature that analyzes run-of-river hydroelectric generating facilities, as defined, in British Columbia, including whether these facilities are, or should be, included as renewable electrical generation facilities for purposes of the Renewable Energy Resources Program administered by the Energy Commission or eligible renewable energy resources for purposes of the RPS program. (5) Existing law requires the PUC, by February 1 of each year, to prepare and submit to the Governor and the Legislature a written report on the costs of programs and activities conducted by an electrical corporation or gas corporation that have more than a specified number of customers in California. This bill would require the PUC, by February 1 of each year, to prepare and submit to the policy and fiscal committees of the Legislature a report on (A) all electrical corporation revenue requirement increases associated with meeting the renewables portfolio standard, (B) all cost savings experienced, or costs avoided, by electrical corporations as a result of meeting the renewables portfolio standard, (C) all costs incurred by electrical corporations for incentives for distributed and renewable generation, (D) all cost savings experienced, or costs avoided, by electrical corporations as a result of incentives for distributed generation and renewable generation, (E) specified costs for which an electrical corporation is seeking recovery in rates that are pending determination or approval by the PUC, (F) the decision number of each PUC decision in the prior year authorizing an electrical corporation to recover costs incurred in rates, (G) any changes in the prior year in load serviced by an electrical corporation, and (H) the efforts each electrical corporation is taking to recruit and train employees to ensure an adequately trained and available workforce. (6) The bill would require the PUC, by July 1, 2011, to determine the effective load carrying capacity of wind and solar energy resources on the electrical grid. The bill would require the PUC to use those values in establishing the contribution of those resources toward meeting specified resource adequacy requirements. (7) The Public Utilities Act prohibits any electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction, termed a certificate of public convenience and necessity. This bill would require the PUC to issue a decision on an application for a certificate of public convenience and necessity within 18 months of the filing of a completed application under specified circumstances. (8) Existing law establishes the Department of Fish and Game in the Natural Resources Agency, and generally charges the department with the administration and enforcement of the Fish and Game Code. This bill would require the department to establish an internal division with the primary purpose of performing comprehensive planning and environmental compliance services with priority given to projects involving the building of eligible renewable energy resources. (9) The existing restructuring of the electrical industry within the Public Utilities Act provides for the establishment of an Independent System Operator (ISO) . Existing law requires the ISO to ensure efficient use and reliable operation of the transmission grid consistent with achieving planning and operating reserve criteria no less stringent than those established by the Western Electricity Coordinating Council of the North American Electric Reliability Corporation. Pursuant to existing law, the ISO's tariffs are required to be approved by the Federal Energy Regulatory Commission. This bill would require the ISO and other California balancing authorities to work cooperatively to integrate and interconnect eligible renewable energy resources to the transmission grid by the most efficient means possible with the goal of minimizing the impact and cost of new transmission facilities needed to meet both reliability needs and the renewables portfolio standard procurement requirements, and to accomplish this in a manner that respects the ownership, business, and dispatch models for transmission facilities owned by electrical corporations, local publicly owned electric utilities, joint power agencies, and independent transmission companies. (10) This bill would appropriate $322,000 from the Public Utilities Commission Utilities Reimbursement Account to the PUC for additional staffing to identify, review, and approve transmission lines reasonably necessary or appropriate to facilitate achievement of the renewables portfolio standard. (11) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Bill Sponsors (6)

Votes


Actions


Apr 12, 2011

California State Legislature

Approved by the Governor.

California State Legislature

Chaptered by Secretary of State. Chapter 1, Statutes of 2011-12 First Extraordinary Session.

Apr 04, 2011

California State Legislature

Enrolled and presented to the Governor at 1 p.m.

Mar 29, 2011

Senate

In Senate. Ordered to engrossing and enrolling.

Assembly

Read third time. Passed. (Ayes 55. Noes 19. Page 134.) Ordered to the Senate.

Mar 15, 2011

Assembly

Read second time. Ordered to third reading.

Mar 14, 2011

Assembly

From committee: Do pass. (Ayes 12. Noes 3.) (March 14).

Mar 08, 2011

Assembly

From committee: Do pass and re-refer to Com. on APPR. (Ayes 6. Noes 3.) (March 7). Re-referred to Com. on APPR.

  • Referral-Committee
  • Committee-Passage
  • Committee-Passage-Favorable
Com. on APPR.

Mar 03, 2011

Assembly

From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 10. Noes 3.) (March 3). Re-referred to Com. on NAT. RES.

  • Referral-Committee
  • Committee-Passage
  • Committee-Passage-Favorable
Com. on NAT. RES.

Feb 28, 2011

Assembly

Referred to Coms. on U. & C. and NAT. RES.

  • Referral-Committee
Coms. on U. & C. and NAT. RES.

Feb 24, 2011

Assembly

In Assembly. Read first time. Held at Desk.

Senate

Read third time. Passed. (Ayes 26. Noes 11. Page 44.) Ordered to the Assembly.

Feb 23, 2011

Senate

Read second time. Ordered to third reading.

Senate

From committee: Do pass. (Ayes 5. Noes 1. Page 42.) (February 23).

Feb 19, 2011

Senate

Set for hearing February 23.

Feb 15, 2011

Senate

From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 2. Page 35.) (February 15). Re-referred to Com. on APPR.

  • Referral-Committee
  • Committee-Passage
  • Committee-Passage-Favorable
Com. on APPR.

Feb 11, 2011

Senate

Set for hearing February 15.

Feb 10, 2011

Senate

Re-referred to Com. on E. U. & C.

  • Referral-Committee
Com. on E. U. & C.

Feb 01, 2011

Senate

(Corrected March 29.)

Senate

Introduced. Read first time. Referred to Com. on RLS.

  • Referral-Committee
  • Introduction
  • Reading-1
Com. on RLS.

Bill Text

Bill Text Versions Format
SB2 HTML
02/01/11 - Introduced PDF
03/31/11 - Enrolled PDF
04/12/11 - Chaptered PDF

Related Documents

Document Format
No related documents.

Sources

Data on Open States is updated periodically throughout the day from the official website of the California State Legislature.

If you notice any inconsistencies with these official sources, feel free to file an issue.